Problems of Expedited Implementation: The Strategic Petroleum Reserve
David Weimer
Journal of Public Policy, 1983, vol. 3, issue 2, 169-190
Abstract:
At each stage of program implementation – strategic planning, systems design, development of the management control infrastructure, and project execution – different types of expertise are most critical to success. The civil service system, which is oriented toward the hiring of permanent employees, and personnel ceilings, which are often arbitrarily set in the budgeting process, interact to impede the transition from one implementation stage to the next. Cost overruns and long-run schedule slippage may result from attempts to expedite programs by beginning implementation stages in parallel, particularly if compensatory resources are not provided. These problems are illustrated with the history of the implementation of the strategic petroleum reserve program, a key element of US policy for reducing vulnerability to disruptions of the world oil market.
Date: 1983
References: Add references at CitEc
Citations:
Downloads: (external link)
https://www.cambridge.org/core/product/identifier/ ... type/journal_article link to article abstract page (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:cup:jnlpup:v:3:y:1983:i:02:p:169-190_00
Access Statistics for this article
More articles in Journal of Public Policy from Cambridge University Press Cambridge University Press, UPH, Shaftesbury Road, Cambridge CB2 8BS UK.
Bibliographic data for series maintained by Kirk Stebbing ().