Backward planning: Effects of planning direction on predictions of task completion time
Jessica Wiese,
Roger Buehler and
Dale Griffin
Judgment and Decision Making, 2016, vol. 11, issue 2, 147-167
Abstract:
People frequently underestimate the time needed to complete tasks and we examined a strategy – known as backward planning – that may counteract this optimistic bias. Backward planning involves starting a plan at the end goal and then working through required steps in reverse-chronological order, and is commonly advocated by practitioners as a tool for developing realistic plans and projections. We conducted four experiments to test effects on completion time predictions and related cognitive processes. Participants planned for a task in one of three directions (backward, forward, or unspecified) and predicted when it would be finished. As hypothesized, predicted completion times were longer (Studies 1–4) and thus less biased (Study 4) in the backward condition than in the forward and unspecified conditions. Process measures suggested that backward planning may increase attention to situational factors that delay progress (e.g., obstacles, interruptions, competing demands), elicit novel planning insights, and alter the conceptualization of time.
Date: 2016
References: Add references at CitEc
Citations:
Downloads: (external link)
https://www.cambridge.org/core/product/identifier/ ... type/journal_article link to article abstract page (text/html)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:cup:judgdm:v:11:y:2016:i:2:p:147-167_2
Access Statistics for this article
More articles in Judgment and Decision Making from Cambridge University Press Cambridge University Press, UPH, Shaftesbury Road, Cambridge CB2 8BS UK.