Descriptive Framework for Project Management for the Implantation of Enterprise IT Applications in SMEs
Irving Reascos,
Diego Trejo,
Mauricio Rea and
Jayli De La Torre
Data and Metadata, 2025, vol. 4, 760
Abstract:
Adopting an Enterprise IT Application (EITA) is a complex process that requires effective management to ensure success. Studies show that failure rates for such projects range from 30% to 70%, with 57% of implementations taking longer than expected, 54% exceeding budget, and 41% failing to achieve the anticipated benefits. This paper proposes a framework for managing EITA implementation projects in small and medium-sized enterprises (SMEs). The framework was developed by coding and analyzing interviews with 18 professionals who have experience with EITA implementations. The interviews were transcribed and analyzed using the qualitative analysis software MaxQDA. The outcome is a descriptive framework that outlines the necessary activities for each phase of an EITA implementation project, taking into account the specific limitations and constraints of SMEs. This framework is designed to be a practical tool for project managers overseeing EITA implementations in SMEs, as well as for professionals new to this type of project, providing them with a foundational structure for effective project management.
Date: 2025
References: Add references at CitEc
Citations:
There are no downloads for this item, see the EconPapers FAQ for hints about obtaining it.
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:dbk:datame:v:4:y:2025:i::p:760:id:1056294dm2025760
DOI: 10.56294/dm2025760
Access Statistics for this article
More articles in Data and Metadata from AG Editor
Bibliographic data for series maintained by Javier Gonzalez-Argote ().