Economic Feasibility Study of Integrated Virtual Power Plants with Renewables for Railway System in Germany
Nurkhat Zhakiyev (),
Philipp Heisig () and
Carsten Wolff ()
Additional contact information
Nurkhat Zhakiyev: School of Artificial Intelligence and Data Science, Astana IT University, Astana, Kazakhstan; & Institute for the Digital Transformation of Application and Living Domains (IDiAL), Dortmund University of Applied Sciences, Dortmund, Germany
Philipp Heisig: Institute for the Digital Transformation of Application and Living Domains (IDiAL), Dortmund University of Applied Sciences, Dortmund, Germany
Carsten Wolff: Institute for the Digital Transformation of Application and Living Domains (IDiAL), Dortmund University of Applied Sciences, Dortmund, Germany
International Journal of Energy Economics and Policy, 2025, vol. 16, issue 1, 405-416
Abstract:
This study examines whether a traction-oriented virtual power plant can deliver cost-competitive, low-carbon electricity into Deutsche Bahn's 110 kV/16.7 Hz railway network and defines the contractual and technological conditions for bankability. The considered case study consists of a 104 MW portfolio - 60 MW wind and 40 MW PV as the primary focus, complemented by 2 MW run-of-river and 2 MW biogas that are included as an possible extension of the model - together with 20 MWh of storage, and integrates dedicated 16.7 Hz conversion. To evaluate the economic viability of this portfolio, we apply a model with scenarios varying Power Purchase Agreement (PPA) tenor (10, 20, 30 years), discount rates (2-6%), and tariffs. Results show contract tenor as the key determinant of viability: extending the PPA from 10 to 30 years reduces LCOE from ~7.4 to ~6.1 ct?/kWh and increases NPV roughly threefold. Price for frequency-conversion hardware significantly influences deployment. A transparent marginal-price mechanism for rural prosumers, reflecting temporal and locational value while covering conversion and balancing costs, aligns incentives and enables stable participation without direct subsidies. For practice, railway operators should prioritise 20-30-year PPAs with clear converter-performance and harmonics standards. Regulators can support deployment through standardised 16.7 Hz interconnection rules and modest credit enhancements. Community benefits are maximised via simple, transparent contracts and predictable revenue streams. The study's originality lies in coupling techno-economic modelling with frequency-specific engineering constraints, delivering quantitative thresholds for bankability and a practical pricing model for community suppliers, addressing gaps in current rail-energy integration research.
Keywords: Economic Feasibility Study; Virtual Power Plant (VPP); Renewables for Railway Traction Power Grid; Technical and Economic Feasibility; Energy Economics; Railway Power Systems (search for similar items in EconPapers)
Date: 2025
References: Add references at CitEc
Citations:
Downloads: (external link)
https://econjournals.com/index.php/ijeep/article/download/21627/9611 (application/pdf)
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eco:journ2:v:16:y:2025:i:1:id:21627
Ordering information: This journal article can be ordered from
https://econjournals.com/index.php/ijeep
DOI: 10.32479/ijeep.21627
Access Statistics for this article
More articles in International Journal of Energy Economics and Policy from International Journal of Energy Economics and Policy
Bibliographic data for series maintained by Monica Sinhat ().