Uncertainty and the yield curve
J.F. Hackworth
Economics Letters, 2008, vol. 98, issue 3, 259-268
Abstract:
This paper proposes a logistic model for the pricing of future receipts due from government bonds. The model is derived from the assumption that uncertainty about valuations increases the further forward the receipt is scheduled. The entropy of a probability distribution is used as the measure of uncertainty. The model leads to yield curves typically within 5 basis points of the Bank of England's at the long end. At the short end, the results suggest that REPO market data is inconsistent gilts market data.
Date: 2008
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0165-1765(07)00163-2
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:ecolet:v:98:y:2008:i:3:p:259-268
Access Statistics for this article
Economics Letters is currently edited by Economics Letters Editorial Office
More articles in Economics Letters from Elsevier
Bibliographic data for series maintained by Catherine Liu ().