The design of a continuous sampling plan under the conditioned inspection capacity
Reay-Chen Wang and
Sheng-Lin Chang
Engineering Costs and Production Economics, 1989, vol. 16, issue 4, 269-279
Date: 1989
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/0167-188X(89)90168-7
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:ecpeco:v:16:y:1989:i:4:p:269-279
Access Statistics for this article
Engineering Costs and Production Economics is currently edited by R. W. Grubbström
More articles in Engineering Costs and Production Economics from Elsevier
Bibliographic data for series maintained by Catherine Liu ().