Minimizing a generalized quadratic penalty function of job completion times: An improved branch-and-bound approach
Tapan Sen,
Parthasarati Dileepan and
Bharat Ruparel
Engineering Costs and Production Economics, 1990, vol. 18, issue 3, 197-202
Date: 1990
References: Add references at CitEc
Citations: View citations in EconPapers (3)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/0167-188X(90)90121-W
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:ecpeco:v:18:y:1990:i:3:p:197-202
Access Statistics for this article
Engineering Costs and Production Economics is currently edited by R. W. Grubbström
More articles in Engineering Costs and Production Economics from Elsevier
Bibliographic data for series maintained by Catherine Liu ().