EconPapers    
Economics at your fingertips  
 

Capacity-oriented production planning in case of a single bottle-neck

Roland Bemelmans

Engineering Costs and Production Economics, 1985, vol. 9, issue 1-3, 135-140

Date: 1985
References: Add references at CitEc
Citations:

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/0167-188X(85)90020-5
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:ecpeco:v:9:y:1985:i:1-3:p:135-140

Access Statistics for this article

Engineering Costs and Production Economics is currently edited by R. W. Grubbström

More articles in Engineering Costs and Production Economics from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:ecpeco:v:9:y:1985:i:1-3:p:135-140