Coordination and uncertainty in strategic network investment: Case on the North Seas Grid
Ioannis Konstantelos,
Rodrigo Moreno and
Goran Strbac
Energy Economics, 2017, vol. 64, issue C, 131-148
Abstract:
The notion of developing a transnational offshore grid in the North Sea has attracted considerable attention in the past years due to its potential for substantial capital savings and increased scope for cross-border trade, sparking a European-wide policy debate on incentivizing integrated transmission solutions. However, one important aspect that has so far received limited attention is that benefits will largely depend on the eventual deployment pattern of electricity infrastructure which is currently characterized by severe locational, sizing and timing uncertainty. Given the lack of coordination between generation and network developments across Europe, there is a real risk for over-investment or a premature lock-in to options that exhibit limited adaptability. In the near future, important choices that have to be made concerning the network topology and amount of investment. In this paper we identify the optimal, in terms of reduced cost, network investment (including topology) in the North Seas countries under four deployment scenarios and five distinct policy choices differing in the level of offshore coordination and international market integration. By drawing comparisons between the study results, we quantify the net benefit of enabling different types of coordination under each scenario. Furthermore, we showcase a novel min–max regret optimization model and identify minimum regret first-stage commitments which could be deployed in the near future in order to enhance strategic optionality, increase adaptability to different future conditions and hence reduce any potential sub-optimality of the initial network design. In view of the above, we put forward specific policy recommendations regarding the adoption of a flexible anticipatory expansion framework for the identification of attractive investment opportunities under uncertainty.
Keywords: Onshore and offshore transmission investment; Cross-border interconnection; Offshore coordination; Min–max regret planning; Net benefit allocation (search for similar items in EconPapers)
JEL-codes: C61 E61 F42 O13 O18 O21 (search for similar items in EconPapers)
Date: 2017
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (9)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0140988317300889
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:eneeco:v:64:y:2017:i:c:p:131-148
DOI: 10.1016/j.eneco.2017.03.022
Access Statistics for this article
Energy Economics is currently edited by R. S. J. Tol, Beng Ang, Lance Bachmeier, Perry Sadorsky, Ugur Soytas and J. P. Weyant
More articles in Energy Economics from Elsevier
Bibliographic data for series maintained by Catherine Liu ().