A regional energy paradox--the case of Central Norway
Maria Sandsmark
Energy Policy, 2009, vol. 37, issue 11, 4549-4556
Abstract:
Central Norway is expected to have a gap of 8Â TWh in 2010 because of heavy investments in energy-intensive industries. The region has two landing sites for natural gas and a considerable potential for wind power to cover the gap. Small-scale hydropower and upgrading of existing hydropower plants also constitute a regional energy potential. Paradoxically, the most realistic investment prospect seems to be extensive investments in new transmission lines to cover the supply deficit. The aim of this paper is to present a problem of regional supply security and public intervention to illustrate and discuss the challenges of arriving at long-term capacity adequacy in deregulated electricity markets.
Keywords: Supply; security; Investment; incentives; Regulatory; risk (search for similar items in EconPapers)
Date: 2009
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0301-4215(09)00425-X
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:enepol:v:37:y:2009:i:11:p:4549-4556
Access Statistics for this article
Energy Policy is currently edited by N. France
More articles in Energy Policy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().