CCS from the gas-fired power station at Kårstø? A commercial analysis

Petter Osmundsen and Magne Emhjellen

Energy Policy, 2010, vol. 38, issue 12, 7818-7826

Abstract: Summary The article presents a commercial investment analysis of the carbon capture project at the Kårstø gas processing plant in south-western Norway. We update an earlier analysis and critically review the methods used--including those applied for cost estimating. Our conclusion is that carbon capture and storage (CCS) at Kårstø would be a very unprofitable climate measure with poor cost efficiency. It would require more than USD 1.7 billion1 in subsidies, or in excess of USD 133 million per year. That corresponds to a subsidy of roughly USD 0.1 per kWh on the power station's electricity output. The cost per tonne of carbon emissions abated is about USD 333, which is about 20 times the international carbon emission allowance price and many times higher than alternative domestic climate measures.

Keywords: Climate; projects; Decision; analyses; CCS (search for similar items in EconPapers)
Date: 2010
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (5)

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0301-4215(10)00656-7
Full text for ScienceDirect subscribers only

Related works:
Working Paper: CCS from the gas-fired power station at Kårstø A commercial analysis (2010) Downloads
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:enepol:v:38:y:2010:i:12:p:7818-7826

Access Statistics for this article

Energy Policy is currently edited by N. France

More articles in Energy Policy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-23
Handle: RePEc:eee:enepol:v:38:y:2010:i:12:p:7818-7826