EconPapers    
Economics at your fingertips  
 

Indian UMPP dream turned sour: A case study based discussion

Mohit Goyal, Hemant Dujari and Sarthak Misra

Energy Policy, 2012, vol. 46, issue C, 427-433

Abstract: India has experienced a peak power deficit of more than 12% in the last decade. In order to reduce the deficit, policymakers initiated a new energy planning policy through the introduction of Ultra Mega Power Projects (UMPP). However, since the introduction of UMPP Policy in 2006, a number of instances have exhibited the limitations in its implementation and its inability to adapt to changes in the external factors. These limitations have ranged from a change in the bidding guidelines post awarding of project; to external threats such as regulatory changes in a foreign country. This paper attempts to draw learning from issues in the implementation of UMPP policy through short case discussions. The authors subsequently illustrate the issues faced during implementation and actions taken by the Government; and suggest possible measures to resolve these issues.

Keywords: Ultra Mega Power Plants; Competitive bidding; Energy policy (search for similar items in EconPapers)
Date: 2012
References: View complete reference list from CitEc
Citations: View citations in EconPapers (1)

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S030142151200290X
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:enepol:v:46:y:2012:i:c:p:427-433

DOI: 10.1016/j.enpol.2012.04.005

Access Statistics for this article

Energy Policy is currently edited by N. France

More articles in Energy Policy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:enepol:v:46:y:2012:i:c:p:427-433