Abstract:
India has experienced a peak power deficit of more than 12% in the last decade. In order to reduce the deficit, policymakers initiated a new energy planning policy through the introduction of Ultra Mega Power Projects (UMPP). However, since the introduction of UMPP Policy in 2006, a number of instances have exhibited the limitations in its implementation and its inability to adapt to changes in the external factors. These limitations have ranged from a change in the bidding guidelines post awarding of project; to external threats such as regulatory changes in a foreign country. This paper attempts to draw learning from issues in the implementation of UMPP policy through short case discussions. The authors subsequently illustrate the issues faced during implementation and actions taken by the Government; and suggest possible measures to resolve these issues.
Keywords: Ultra Mega Power Plants; Competitive bidding; Energy policy (search for similar items in EconPapers)
Date: 2012
References: View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S030142151200290X
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:enepol:v:46:y:2012:i:c:p:427-433
DOI: 10.1016/j.enpol.2012.04.005
Access Statistics for this article
Energy Policy is currently edited by N. France
More articles in Energy Policy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().