The resource adequacy scheme in the Korean electricity market
Hyunsook Kim and
Sung-Soo Kim
Energy Policy, 2012, vol. 47, issue C, 133-144
Abstract:
In South Korea, the incentive scheme for generators to add new power generation is based on the system marginal price (SMP) and the capacity payment (CP). The infra-marginal generators receive an extra margin due to the high SMP level and the new infra-marginal generators need to be built to achieve the optimal fuel mix. However, the Metropolitan zone needs more marginal generators due to the transmission congestion and environmental regulations, but the marginal generator in the Metropolitan zone does not have adequate profits for the new investment under the current CP. This paper suggests the appropriate investment incentive scheme for different zones. The introduction of forward capacity markets for different regions creates higher capacity market prices in the Metropolitan zone than those in the Southern zone. The introduction of forward capacity market also induces a new LNG generator investment in the Metropolitan zone while only new infra-marginal generators need to be added in the Southern zone.
Keywords: Resource adequacy; Capacity payment; Forward local capacity market (search for similar items in EconPapers)
Date: 2012
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (5)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0301421512003400
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:enepol:v:47:y:2012:i:c:p:133-144
DOI: 10.1016/j.enpol.2012.04.035
Access Statistics for this article
Energy Policy is currently edited by N. France
More articles in Energy Policy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().