EconPapers    
Economics at your fingertips  
 

Transmission expansion planning in Northern Europe in 2030—Methodology and analyses

Stefan Jaehnert, Ove Wolfgang, Hossein Farahmand, Steve Völler and Daniel Huertas-Hernando

Energy Policy, 2013, vol. 61, issue C, 125-139

Abstract: The expected increase of intermittent electricity production imposed by renewable energy sources in Northern Europe poses rising challenges to the operation of the power system. The Nordic hydro based power system, particularly the Norwegian, is in a favourable position to provide necessary production flexibility to the Continental European power system. For this provision sufficient transfer capacity is required.

Keywords: Transmission expansion planning; Wind power production; Hydro power production (search for similar items in EconPapers)
Date: 2013
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (17)

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0301421513005053
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:enepol:v:61:y:2013:i:c:p:125-139

DOI: 10.1016/j.enpol.2013.06.020

Access Statistics for this article

Energy Policy is currently edited by N. France

More articles in Energy Policy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:enepol:v:61:y:2013:i:c:p:125-139