Reconciling self-sufficiency and renewable energy targets in a hydro dominated system: The view from British Columbia
Amy Sopinka,
Gerrit van Kooten and
Linda Wong
Energy Policy, 2013, vol. 61, issue C, 223-229
Abstract:
British Columbia's energy policy is at a crossroads; the province has set a goal of electricity self-sufficiency, a 93% renewable portfolio standard and a natural gas development strategy that could increase electricity consumption by 21TWh to 33TWh. To ascertain the BC's supply position, a mathematical programming model of the physical workings of BC's hydroelectric generating system is developed, with head heights at the two dominant power stations treated as variable. Using historical water inflow and reservoir level data, the model is used to investigate whether BC is capable of meeting its self-sufficiency goals under various water supply and electricity demand scenarios.
Keywords: Hydroelectric power generation; Renewable electricity standards; Variable head height (search for similar items in EconPapers)
Date: 2013
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (3)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0301421513004205
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:enepol:v:61:y:2013:i:c:p:223-229
DOI: 10.1016/j.enpol.2013.05.068
Access Statistics for this article
Energy Policy is currently edited by N. France
More articles in Energy Policy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().