Improved cost–benefit analysis for market-based transmission planning, a European perspective
A. Papaemmanouil,
L. Bertling Tjernberg,
L.A. Tuan and
G. Andersson
Energy Policy, 2013, vol. 63, issue C, 215-223
Abstract:
This paper addresses the problem of transmission planning in interconnected power systems under the uncertainty of future generation parks and fast varying marginal production costs. The decision maker has to consider many different aspects during the definition of different transmission planning strategies that sometimes might even be contradicting. Major contributions are the incorporation of energy policy measurements in the evaluation process of candidate transmission plans and the inclusion of short- and long-term uncertainties. The proposed methodology, so-called C-TRAP, is based on a semi-dynamic heuristic approach that solves the social welfare maximization problem for several discrete steps considering different preferences for energy policy and transmission network reinforcements. The flexibility provided through the heuristic analysis is very important for decision makers in the new uncertain environment in power systems.
Keywords: Future electric power systems; Uncertain transmission planning; Cost–benefit analysis (search for similar items in EconPapers)
Date: 2013
References: View complete reference list from CitEc
Citations: View citations in EconPapers (4)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0301421513008707
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:enepol:v:63:y:2013:i:c:p:215-223
DOI: 10.1016/j.enpol.2013.08.066
Access Statistics for this article
Energy Policy is currently edited by N. France
More articles in Energy Policy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().