Network expansion by a proactive transmission system operator: A case study
Angelamaria Groppi and
Elena Fumagalli
Energy Policy, 2014, vol. 69, issue C, 610-623
Abstract:
Complex planning procedures often amplify the difference in investment time between generation and transmission. In this work we consider a transmission project in Italy and, relying on a recently proposed methodology, we compare costs and benefits of anticipating the planning process before the connection of new power plants becomes certain. Whereas the system faces lower congestion costs if the network is reinforced immediately, anticipation constitutes a sunk cost in case generation is not built. For realistic load and generation scenarios, anticipation costs, as well as differences in investment times, our results indicate that anticipation is the most efficient choice for a relatively low connection probability. Analyses of this sort are particularly relevant in light of the increasing complexity of public engagement processes and of the remarkable growth in renewable generation.
Keywords: Transmission network; Investment planning; Anticipation (search for similar items in EconPapers)
Date: 2014
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0301421514001499
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:enepol:v:69:y:2014:i:c:p:610-623
DOI: 10.1016/j.enpol.2014.03.002
Access Statistics for this article
Energy Policy is currently edited by N. France
More articles in Energy Policy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().