EconPapers    
Economics at your fingertips  
 

The short term (1-15 months) planning and control of a steel plant

Jorma Kuutti and Ovako Oy

Engineering and Process Economics, 1979, vol. 4, issue 2-3, 235-243

Date: 1979
References: Add references at CitEc
Citations:

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/0377-841X(79)90035-4
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:eproec:v:4:y:1979:i:2-3:p:235-243

Access Statistics for this article

Engineering and Process Economics is currently edited by A. Rose

More articles in Engineering and Process Economics from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:eproec:v:4:y:1979:i:2-3:p:235-243