Simulation-based turnaround evaluation for Lelystad Airport
Miguel Mujica Mota,
Geert Boosten,
Nico De Bock,
Edgar Jimenez and
Jorge Pinho de Sousa
Journal of Air Transport Management, 2017, vol. 64, issue PA, 21-32
Abstract:
The airport of Lelystad in North Holland will be upgraded to attract commercial traffic from Schiphol. In this paper we present the simulation-based analysis for Lelystad Airport with the objective of identifying the most promising configuration, identifying potential problems and capacity limitations in the system. Three layouts for the apron were tested and we analyzed in the model the use of vehicles for the ground handling service, different demand levels and different allocations for aircraft, in addition we included the uncertainty inherent to these systems. The results allowed to get to the conclusion that some configurations are more attractive than others but the variability of the system might play an important role in order to make the airport more or less attractive to commercial airlines.
Keywords: Airport simulation; Ground operations; Turnaround time; Airport performance (search for similar items in EconPapers)
Date: 2017
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (4)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0969699717302909
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:jaitra:v:64:y:2017:i:pa:p:21-32
DOI: 10.1016/j.jairtraman.2017.06.021
Access Statistics for this article
Journal of Air Transport Management is currently edited by Anne Graham
More articles in Journal of Air Transport Management from Elsevier
Bibliographic data for series maintained by Catherine Liu ().