Productivity, performance and project management in the scientific instrument industry
Sa Bergen and
Aw Pearson
Omega, 1983, vol. 11, issue 1, 27-32
Abstract:
Scientific instruments have short product lifecycles and a lengthening of the time between design and application has serious financial implications. This paper reports on research aimed at obtaining a greater understanding of the factors which influence this interface. Interviews were conducted at 32 companies in two countries, the United Kingdom (UK) and the Federal Republic of Germany (FRG). The study showed that there are statistically significant differences between the two countries and that in the FRG there are also differences between projects led by people with different qualifications and background experience. These differences are analysed and discussed and factors identified which influence productivity and performance in the scientific instrument industry.
Date: 1983
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/0305-0483(83)90080-4
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:jomega:v:11:y:1983:i:1:p:27-32
Ordering information: This journal article can be ordered from
http://www.elsevier.com/wps/find/supportfaq.cws_home/regional
https://shop.elsevie ... _01_ooc_1&version=01
Access Statistics for this article
Omega is currently edited by B. Lev
More articles in Omega from Elsevier
Bibliographic data for series maintained by Catherine Liu ().