Trends in project cost control systems
Sn Nandi and
Bk Dutta
Omega, 1988, vol. 16, issue 6, 513-520
Abstract:
The salient features of a cost control approach that could make it effective in an engineering plant construction project environment have been analysed. Various project cost control approaches (pre-and post-network based ones along with PERT/COST) are reviewed. The trends indicate that future project cost control will be more decentralised but more closely integrated in terms of achieving total project objectives. This approach will move through several cycles associated with a near-optimum plan with respect to multiple objectives of various participants in a project, formulated by various operational research methods, such as simulation, heuristic and other programming and cost models. In addition, future project cost control has to be more adaptive, and will require further efforts from operational researchers, cost engineers and others before it may be made effective and versatile in a dynamic environment. A case example is incorporated to illustrate the application of some of the concepts referred to.
Date: 1988
References: Add references at CitEc
Citations: View citations in EconPapers (4)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/0305-0483(88)90025-4
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:jomega:v:16:y:1988:i:6:p:513-520
Ordering information: This journal article can be ordered from
http://www.elsevier.com/wps/find/supportfaq.cws_home/regional
https://shop.elsevie ... _01_ooc_1&version=01
Access Statistics for this article
Omega is currently edited by B. Lev
More articles in Omega from Elsevier
Bibliographic data for series maintained by Catherine Liu ().