Work release strategies in a dual resource constrained job shop
Pm Bobrowski and
Ps Park
Omega, 1989, vol. 17, issue 2, 177-188
Abstract:
One of the basic assumptions in past job shop research is that arriving jobs are immediately released to the shop floor for processing regardless of available job and shop information. In practice, jobs arriving at the shop are usually collected into a backlog file. Jobs are then released by some mechanism so that they can be processed within the time available before the due date. This study examines the effects of several release mechanisms on the performance of a dual resource constrained job shop. The release mechanisms differ in the amount and types of information used to make release decisions. Four release mechanisms are tested in conjunction with two dynamic, due date oriented dispatching rules, Modified Operation Due Date and Critical Ratio. The job shop environment is specified by two levels of due date tightness. A labor and machine limited job shop model was used to simulate the shop performance.
Date: 1989
References: Add references at CitEc
Citations: View citations in EconPapers (7)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/0305-0483(89)90009-1
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:jomega:v:17:y:1989:i:2:p:177-188
Ordering information: This journal article can be ordered from
http://www.elsevier.com/wps/find/supportfaq.cws_home/regional
https://shop.elsevie ... _01_ooc_1&version=01
Access Statistics for this article
Omega is currently edited by B. Lev
More articles in Omega from Elsevier
Bibliographic data for series maintained by Catherine Liu ().