Project scheduling with work packages

Rf Deckro, Je Hebert and Wa Verdini

Omega, 1992, vol. 20, issue 2, 169-182

Abstract: The use of work breakdown structures and work packages as a method of disaggregation is a standard approach in many project management procedures. In this study we propose a mathematical programming framework for scheduling project activities with variable durations in a work package environment. The modeling approach has the flexibility to consider budgetary and other operational constraints, is useful in the planning/proposal stage of a project, and provides a systematic method for analyzing the impact of project and work package due dates on cost and budget performance. Post-optimality analysis information available in most mathematical programming software packages can be used to fine tune both bids and operational schedules. We provide several illustrative examples of the modeling approach and conclude with suggestions for future research.

Keywords: project; planning; budgeting; work; packages (search for similar items in EconPapers)
Date: 1992
References: Add references at CitEc
Citations: View citations in EconPapers (2)

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/0305-0483(92)90071-E
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:jomega:v:20:y:1992:i:2:p:169-182

Ordering information: This journal article can be ordered from
http://www.elsevier.com/wps/find/supportfaq.cws_home/regional
https://shop.elsevie ... _01_ooc_1&version=01

Access Statistics for this article

Omega is currently edited by B. Lev

More articles in Omega from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:jomega:v:20:y:1992:i:2:p:169-182