Comparing two aggregate planning models
S Barman and
Rj Tersine
Omega, 1993, vol. 21, issue 5, 511-517
Abstract:
The sensitivity of the linear programming (LP) model to forecast errors in aggregate planning (AP) is evaluated and its performance compared with that of the production switching heuristic (PSH) model. Two versions of the PSH, the popular three-level model and a two-level extension, are considered. While the LP tends to outperform the PSH in situations with high forecast errors, the performances of the models are comparable for low to moderate forecast errors. The use of an additional production and workforce level in the PSH is not justified unless forecast errors are high. A variation in the forecast error distribution had no significant effect on these findings.
Keywords: aggregate; planning; forecasting; heuristics; search; procedure (search for similar items in EconPapers)
Date: 1993
References: Add references at CitEc
Citations:
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/0305-0483(93)90019-H
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:jomega:v:21:y:1993:i:5:p:511-517
Ordering information: This journal article can be ordered from
http://www.elsevier.com/wps/find/supportfaq.cws_home/regional
https://shop.elsevie ... _01_ooc_1&version=01
Access Statistics for this article
Omega is currently edited by B. Lev
More articles in Omega from Elsevier
Bibliographic data for series maintained by Catherine Liu ().