Heuristic algorithms for the two-machine flowshop with limited machine availability
Jacek Blazewicz,
Joachim Breit,
Piotr Formanowicz,
Wieslaw Kubiak and
Günter Schmidt
Omega, 2001, vol. 29, issue 6, 599-608
Abstract:
The paper studies a flowshop scheduling problem where machines are not available in given time intervals. The objective is to minimize the makespan. The problem is known to be NP-hard for two machines. We analyze constructive and local search based heuristic algorithms for the two-machine case. The algorithms are tested on easy and difficult test problems with up to 100 jobs and 10 intervals of non-availability. Computational results show that the algorithms perform well. For many problems an optimum solution is found.
Keywords: Flowshop; Availability; constraints; Scheduling; Heuristics (search for similar items in EconPapers)
Date: 2001
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (9)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0305-0483(01)00048-2
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:jomega:v:29:y:2001:i:6:p:599-608
Ordering information: This journal article can be ordered from
http://www.elsevier.com/wps/find/supportfaq.cws_home/regional
https://shop.elsevie ... _01_ooc_1&version=01
Access Statistics for this article
Omega is currently edited by B. Lev
More articles in Omega from Elsevier
Bibliographic data for series maintained by Catherine Liu ().