Minimization of maximum lateness under linear deterioration
Y. S. Hsu and
B. M. T. Lin
Omega, 2003, vol. 31, issue 6, 459-469
Abstract:
This paper considers a single-machine scheduling problem to minimize the maximum lateness. The processing time of each job is a linear function of the time when the job starts processing. This problem is known to be -hard in the literature. In this paper, we design a branch-and-bound algorithm for deriving exact solutions by incorporating several properties concerning dominance relations and lower bounds. These properties produce synergic effects in accelerating the solution finding process such that the algorithm can solve problems of 100 jobs within 1 min on average. To compose approximate solutions, we revise a heuristic algorithm available in the literature and propose several hybrid variants. Numerical results evince that the proposed approaches are very effective in successfully reporting optimal solutions for most of the test cases.
Keywords: Operations; scheduling; Linear; deterioration; Maximum; lateness; Branch-and-bound; algorithm; Heuristic; algorithm (search for similar items in EconPapers)
Date: 2003
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (4)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0305-0483(03)00093-8
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:jomega:v:31:y:2003:i:6:p:459-469
Ordering information: This journal article can be ordered from
http://www.elsevier.com/wps/find/supportfaq.cws_home/regional
https://shop.elsevie ... _01_ooc_1&version=01
Access Statistics for this article
Omega is currently edited by B. Lev
More articles in Omega from Elsevier
Bibliographic data for series maintained by Catherine Liu ().