EconPapers    
Economics at your fingertips  
 

Inventory management with variable lead-time dependent procurement cost

Charu Chandra and Janis Grabis

Omega, 2008, vol. 36, issue 5, 877-887

Abstract: A reduction in the inventory replenishment lead-time allows reducing safety stock requirements and improving customer service. However, it might be accompanied by increased procurement costs because of premium charges imposed by suppliers, or higher transportation costs. This paper studies a single-stage variable lead-time inventory system with lead-time dependent procurement cost. Selection of the lead-time value represents finding the trade-off between benefits of lead-time reduction and increase in the procurement cost. A model for joint optimization of inventory and procurement costs is developed. Numerical studies are conducted to identify conditions under which lead-time reduction is favorable compared to procuring at the lowest cost.

Keywords: Inventory; control; Variable; lead-time; Sensitivity; analysis (search for similar items in EconPapers)
Date: 2008
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (14)

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0305-0483(06)00039-9
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:jomega:v:36:y:2008:i:5:p:877-887

Ordering information: This journal article can be ordered from
http://www.elsevier.com/wps/find/supportfaq.cws_home/regional
https://shop.elsevie ... _01_ooc_1&version=01

Access Statistics for this article

Omega is currently edited by B. Lev

More articles in Omega from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:jomega:v:36:y:2008:i:5:p:877-887