Minimizing number of tardy jobs on a single machine subject to periodic maintenance
Wen-Jinn Chen
Omega, 2009, vol. 37, issue 3, 591-599
Abstract:
This paper considers a single-machine scheduling problem with periodic maintenance. In this study, a schedule consists of several maintenance periods and each maintenance period is scheduled after a periodic time interval. The objective is to find a schedule that minimizes the number of tardy jobs subject to periodic maintenance and nonresumable jobs. Based on the Moore's algorithm, an effective heuristic is developed to provide a near-optimal schedule for the problem. A branch-and-bound algorithm is also proposed to find the optimal schedule. Some important theorems associated with the problem are implemented in the algorithm. Computational results are presented to demonstrate the effectiveness of the proposed heuristic.
Keywords: Scheduling; Periodic; maintenance; Tardy; job; Nonresumable; job (search for similar items in EconPapers)
Date: 2009
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (21)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0305-0483(08)00002-9
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:jomega:v:37:y:2009:i:3:p:591-599
Ordering information: This journal article can be ordered from
http://www.elsevier.com/wps/find/supportfaq.cws_home/regional
https://shop.elsevie ... _01_ooc_1&version=01
Access Statistics for this article
Omega is currently edited by B. Lev
More articles in Omega from Elsevier
Bibliographic data for series maintained by Catherine Liu ().