An integer programming approach to scheduling in a contaminated area
Tadeusz Sawik
Omega, 2010, vol. 38, issue 3-4, 179-191
Abstract:
This paper presents a time-indexed integer programming formulation for scheduling dependent jobs executed by a team of workers in an area contaminated with radio-active or chemical materials. The dynamics of the harmful factor and the norms of organism recovery imply that each work period for a job should be immediately followed by a rest period for the worker executing this job and the length of the rest period depends on the start time of the corresponding work period. The problem is modeled as an NP-hard problem of scheduling on unrelated parallel processors with start time dependent processing times and different objective functions: maximum or total completion time and maximum or total tardiness. The special case of scheduling jobs executed by a single worker is also considered. Numerical examples and some computational results are reported.
Keywords: Scheduling; Integer; programming; Parallel; processors; Start; time; dependent; processing; time; Contaminated; area (search for similar items in EconPapers)
Date: 2010
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (6)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0305-0483(09)00061-9
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:jomega:v:38:y:2010:i:3-4:p:179-191
Ordering information: This journal article can be ordered from
http://www.elsevier.com/wps/find/supportfaq.cws_home/regional
https://shop.elsevie ... _01_ooc_1&version=01
Access Statistics for this article
Omega is currently edited by B. Lev
More articles in Omega from Elsevier
Bibliographic data for series maintained by Catherine Liu ().