A survey of scheduling problems with late work criteria
Malgorzata Sterna
Omega, 2011, vol. 39, issue 2, 120-129
Abstract:
The paper presents the first complete survey of scheduling problems with the late work criteria. Late work objective functions estimate the quality of a schedule based on durations of late parts of jobs, not taking into account the amount of delay for fully late jobs. The paper provides a formal definition of the late work parameter and compares the criteria based on it with other classical performance measures. It shows the relationship between the late work model and the imprecise computation model known from the hard real-time literature. Moreover, the paper presents a few real world applications of the late work objective function. The paper lists results obtained for nearly forty problems of scheduling jobs on a single machine, parallel (identical and uniform) machines and dedicated machines, investigated in the literature since 1984.
Keywords: Scheduling; Late; work; Single; machine; Parallel; machines; Dedicated; machines (search for similar items in EconPapers)
Date: 2011
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (36)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0305-0483(10)00074-5
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:jomega:v:39:y:2011:i:2:p:120-129
Ordering information: This journal article can be ordered from
http://www.elsevier.com/wps/find/supportfaq.cws_home/regional
https://shop.elsevie ... _01_ooc_1&version=01
Access Statistics for this article
Omega is currently edited by B. Lev
More articles in Omega from Elsevier
Bibliographic data for series maintained by Catherine Liu ().