EconPapers    
Economics at your fingertips  
 

Output planning for material requirements under uncertainty

Donald P Ballou, John C Fisk and Badr E Ismail

Omega, 1980, vol. 8, issue 1, 47-51

Abstract: This paper considers a production planning and control system requiring that, for each work station, a time-phased series of input and output values be estimated. It is assumed that the projected input levels can vary significantly across time periods and that anticipated output levels can be determined by management, subject to limits specified by available manpower and subcontracting. The actual input and output levels for each period depart from the planned levels according to a probability distribution determined empirically. An approach is presented that allows management to evaluate a chosen set of output levels to determine the probability that sufficient amounts of work will be available at a work station each period.

Date: 1980
References: Add references at CitEc
Citations:

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/0305-0483(80)90040-7
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:jomega:v:8:y:1980:i:1:p:47-51

Ordering information: This journal article can be ordered from
http://www.elsevier.com/wps/find/supportfaq.cws_home/regional
https://shop.elsevie ... _01_ooc_1&version=01

Access Statistics for this article

Omega is currently edited by B. Lev

More articles in Omega from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:jomega:v:8:y:1980:i:1:p:47-51