Real option in action: An example of flexible decision making at a mine operational level

Ajak Duany Ajak and Erkan Topal

Resources Policy, 2015, vol. 45, issue C, 109-120

Abstract: Flexibility and operational adaptability are essential for long term corporate success and real option (RO) appears suitable for analysing risky projects. Nevertheless, its application in engineering design has been slow-moving compared to financial uses. Therefore, there is a compelling argument for using visual, intuitive and transparent models, such as the binomial decision tree, which has the potential to eliminate decision maker apprehension and improve RO use in engineering design and decision making. This paper reviews RO applications in mining projects and proposes a new methodology to explore technical applications of RO in mine design and decision making at the mine operational level. The research will investigate the suitability of using the RO method at the mine operational level where production decisions are made frequently, rather than organisational strategies that are reviewed after several years. The proposed approach is applied to a case study. This will demonstrate how RO can be used in designing multiple pits in multi-zone ore deposits to create a switching option between pits regarding changing ore grades and fluctuating commodity prices. The main rationale of this option involves deferring waste materials by switching mining activities from a high to low strip ratio pit. This creates a choice between using new RO thinking and the traditional methodology. The option is analysed using the binomial decision tree. The results summarised in this paper׳s conclusion reveal that the project׳s value increased considerably when flexibility was included in the mine design. These increases in project value were between eight to 15 per cent, depending on the number of flexible options incorporated into the design.

Keywords: Application of real option at mine operational level; Binomial model; Switching option between pits; Flexible design; Risk; Uncertainty; Decision making (search for similar items in EconPapers)
Date: 2015
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (12)

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0301420715000380
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:jrpoli:v:45:y:2015:i:c:p:109-120

DOI: 10.1016/j.resourpol.2015.04.001

Access Statistics for this article

Resources Policy is currently edited by R. G. Eggert

More articles in Resources Policy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:jrpoli:v:45:y:2015:i:c:p:109-120