A method for optimal cut-off grade policy in open pit mining operations under uncertain supply
Asif Khan and
Mohammad Waqar Ali Asad
Resources Policy, 2019, vol. 60, issue C, 178-184
Abstract:
Cut-off grade controls the movement of materials among mining, processing and refining stages of an open pit mining operation. The cut-off grade policy constitutes a schedule of cut-off grades and the associated quantities of materials that flow through various stages over the life of operation. This flow of materials in the system relies on the grade-tonnage curve of the mineral resource and given that the variation in grade-tonnage curve is inevitable, it is crucial that the methods that define the cut-off grade policy must consider this grade uncertainty. However, with few exceptions, a majority of these methods ignore this uncertainty in the supply of materials. This paper shares a two-stage stochastic linear programming based cut-off grade optimisation model that accounts for the grade uncertainty and maximises the net present value (NPV) subject to the production capacity constraints over the life of operation. An application of the proposed method at hypothetical and realistic cases promises higher NPV as compared to the traditional heuristic approach.
Date: 2019
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (7)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0301420718303118
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:jrpoli:v:60:y:2019:i:c:p:178-184
DOI: 10.1016/j.resourpol.2018.12.003
Access Statistics for this article
Resources Policy is currently edited by R. G. Eggert
More articles in Resources Policy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().