EconPapers    
Economics at your fingertips  
 

A risk-based model for performance-based regulation of electric distribution companies

Mostafa Ghasemi and Reza Dashti

Utilities Policy, 2017, vol. 45, issue C, 36-44

Abstract: In this study, a model is presented to obtain the parameters of penalty and reward scheme (PRS) in performance-based regulation (PBR) for each electricity distribution company (EDC) using analytical hierarchy process (AHP) and fuzzy c-means clustering (FCM). In the FCM algorithm, similar companies were categorized into clusters. By using AHP, score of effective factor in reliability index was obtained. In this model, external factors affecting EDCs performance were considered to reduce the risk of PBR implementation for companies and customers. The proposed model was applied on the EDCs in Iran. The results, including AHP score, parameters of PRS and PRS cost were calculated.

Keywords: Performance-based regulation; Distribution system reliability; Reward-and-penalty scheme; Analytical hierarchy process; Fuzzy c-means clustering (search for similar items in EconPapers)
Date: 2017
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (5)

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0957178716301825
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:juipol:v:45:y:2017:i:c:p:36-44

DOI: 10.1016/j.jup.2017.01.001

Access Statistics for this article

Utilities Policy is currently edited by Beecher, Janice

More articles in Utilities Policy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:juipol:v:45:y:2017:i:c:p:36-44