EconPapers    
Economics at your fingertips  
 

Offshore wind decommissioning regulations and workflows in the Outer Continental Shelf United States

Mark J. Kaiser and Brian Snyder

Marine Policy, 2012, vol. 36, issue 1, 113-121

Abstract: Decommissioning regulations for offshore renewable energy facilities require that all facilities be removed and the seafloor cleared of all obstructions at the end of the life of the lease. The purpose of this paper is to provide an overview of the expected workflows and stages of decommissioning that are likely to arise for offshore wind farms, to describe the exposure and liability of the parties involved and to compare offshore wind and oil and gas decommissioning. An alternative method for turbine removal is proposed which, if feasible, will reduce decommissioning cost. The objectives of a bonding program are motivated and discussed.

Keywords: Energy; Policy; Act; BOEMRE; Turbine; removal; Turbine; disposal (search for similar items in EconPapers)
Date: 2012
References: Add references at CitEc
Citations: View citations in EconPapers (2)

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0308597X11000765
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:marpol:v:36:y:2012:i:1:p:113-121

Access Statistics for this article

Marine Policy is currently edited by Eddie Brown

More articles in Marine Policy from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:marpol:v:36:y:2012:i:1:p:113-121