Efficient mixed integer programming models for family scheduling problems
Meng-Ye Lin and
Yarlin Kuo
Operations Research Perspectives, 2017, vol. 4, issue C, 49-55
Abstract:
This paper proposes several mixed integer programming models which incorporate optimal sequence properties into the models, to solve single machine family scheduling problems. The objectives are total weighted completion time and maximum lateness, respectively. Experiment results indicate that there are remarkable improvements in computational efficiency when optimal sequence properties are included in the models. For the total weighted completion time problems, the best model solves all of the problems up to 30-jobs within 5 s, all 50-job problems within 4 min and about 1/3 of the 75-job to 100-job problems within 1 h. For maximum lateness problems, the best model solves almost all the problems up to 30-jobs within 11 min and around half of the 50-job to 100-job problems within 1 h.
Keywords: Family scheduling; Sequence independent setup; Total weighted completion time; Maximum lateness (search for similar items in EconPapers)
Date: 2017
References: Add references at CitEc
Citations: View citations in EconPapers (2)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S2214716016301385
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:oprepe:v:4:y:2017:i:c:p:49-55
DOI: 10.1016/j.orp.2017.03.001
Access Statistics for this article
Operations Research Perspectives is currently edited by Rubén Ruiz Garcia
More articles in Operations Research Perspectives from Elsevier
Bibliographic data for series maintained by Catherine Liu ().