A quantitative analysis of a risk impact due to a starting time extension of the emergency diesel generator in optimized power reactor-1000
Ho-Gon Lim,
Joon-Eon Yang and
Mee-Jeong Hwang
Reliability Engineering and System Safety, 2007, vol. 92, issue 7, 961-970
Abstract:
An emergency diesel generator (EDG) is the ultimate electric power supply source for the operation of emergency engineered safety features when a nuclear power plant experiences a loss of off-site power (LOOP). If a loss of coolant accident (LOCA) with a simultaneous LOOP occurs, the EDG should be in the state of a full power within 10s, which is a prescribed regulatory requirement in the technical specifications (TS) of the Optimized Power Reactor-1000 (OPR-1000).
Keywords: EDG starting time; ECCS rule; LOOP; LOCA; PSA; Risk impact (search for similar items in EconPapers)
Date: 2007
References: View complete reference list from CitEc
Citations:
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S0951832006001517
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:reensy:v:92:y:2007:i:7:p:961-970
DOI: 10.1016/j.ress.2006.07.004
Access Statistics for this article
Reliability Engineering and System Safety is currently edited by Carlos Guedes Soares
More articles in Reliability Engineering and System Safety from Elsevier
Bibliographic data for series maintained by Catherine Liu ().