The importance of time resolution, operational flexibility and risk aversion in quantifying the value of energy storage in long-term energy planning studies
Gabriel Diaz,
Andrés Inzunza and
Rodrigo Moreno
Renewable and Sustainable Energy Reviews, 2019, vol. 112, issue C, 797-812
Abstract:
This paper analyzes the impact of modeling detail in long-term energy planning models when assessing the value of energy storage in electricity markets. By running six optimization models for the long-term planning of combined generation and storage installed capacities in the Chilean electricity system (each with different levels of detail/complexity in terms of time resolution, recognition of operational inflexibility —i.e. technical constraints of power plants— and recognition of uncertainty in fossil fuel prices), we determine six portfolio solutions with significantly different levels of energy storage installed capacity. Furthermore, we found that the total installed capacity of storage plants escalates when increasing the level of modeling complexity, which can be achieved by augmenting the time resolution and the number of constraints that better recognize the inflexibility of generation plants and by acknowledging the presence of long-term uncertainties associated with fossil fuel prices fluctuations. In our particular study, we found a difference of more than an order of magnitude between the amount of installed capacity of storage plants determined by the detailed model (that with hourly resolution and full consideration of technical constraints of power plants) and that obtained by the planning model that adopts the traditional assumptions commonly utilized in regulatory offices around the word (i.e. low time resolution and no recognition of technical/unit commitment constraints and uncertainty). Particularly, we found that the traditional, simplified solution can deliver an installed capacity of storage plants as low as 240 MW (∼1.3% of estimated peak demand), while one of the most sophisticated solutions (which recognizes technical constraints of generating units, but ignores risks) delivers 7.8 GW (∼41.7% of estimated peak demand). Moreover, by running a risk-constrained stochastic planning model, we also determine a risk-averse portfolio solution, which demonstrated the increased value of energy storage capacity in reducing electricity cost risk.
Keywords: Energy storage; Long-term energy planning; Generation expansion planning; CVaR optimization (search for similar items in EconPapers)
Date: 2019
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (21)
Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S1364032119303879
Full text for ScienceDirect subscribers only
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eee:rensus:v:112:y:2019:i:c:p:797-812
Ordering information: This journal article can be ordered from
http://www.elsevier.com/wps/find/journaldescription.cws_home/600126/bibliographic
http://www.elsevier. ... 600126/bibliographic
DOI: 10.1016/j.rser.2019.06.002
Access Statistics for this article
Renewable and Sustainable Energy Reviews is currently edited by L. Kazmerski
More articles in Renewable and Sustainable Energy Reviews from Elsevier
Bibliographic data for series maintained by Catherine Liu ().