A comparative study on energy income estimation: A case study in Turkey

M. Ak, A.M. Yanmaz and E. Kentel

Renewable and Sustainable Energy Reviews, 2014, vol. 38, issue C, 700-705

Abstract: Hydropower is the main domestic energy resource of Turkey. The total gross and the economically feasible hydropower potentials of Turkey are estimated as 433TWh/yr and 127TWh/yr, respectively, by the General Directorate of State Hydraulic Works (DSI) of the Ministry of Forestry and Water Affairs.11Ozkaldi, A. General Directorate of State Hydraulic Works, http://www.dsi.gov.tr/docs/sunumlar/enerji-sunumu---27-11-2011.ppt?sfvrsn=2, 27 October 2011 [accessed 5.05.13]. Approximately 35% of the economically feasible hydropower potential is currently being utilized. The government accelerated the development of the unused potential by enabling the private sector to build and operate hydroelectric power plants. The primary goal of a feasibility study is the determination of the best installed capacity through economic analysis, which is based on evaluation of energy incomes and investment costs associated with alternative installed capacities. Generally, it is relatively easy to realistically estimate the investment costs. On the other hand, energy income estimation is not a straight forward process; a number of different methods which result in different income estimates are being used in Turkey. The General Directorate of Renewable Energy (YEGM) of the Ministry and Natural Resources and DSI recommend similar methods for energy income estimation based on firm and secondary energy generations. However, suggested unit prices for firm and secondary energy generations by DSI and YEGM are quite different, which results in different energy income estimations. Apart from these two methods, consultancy firms, unlike DSI and YEGM, use a single unit price for energy without making any distinction between firm and secondary energies. In all three methods fixed energy prices are used. Nevertheless these approaches do not represent the current situation in Turkey, since the electricity market allows development of hourly electricity prices. In this study, a new energy income estimation method which utilizes hourly electricity prices, called the Variable Price Method is developed. Results of these four methods are compared for a case study, namely Altiparmak Hydroelectric Power Plant.

Keywords: Hydropower; Energy income estimation; Pricing (search for similar items in EconPapers)
Date: 2014
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (2)

Downloads: (external link)
http://www.sciencedirect.com/science/article/pii/S136403211400464X
Full text for ScienceDirect subscribers only

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eee:rensus:v:38:y:2014:i:c:p:700-705

Ordering information: This journal article can be ordered from
http://www.elsevier.com/wps/find/journaldescription.cws_home/600126/bibliographic
http://www.elsevier. ... 600126/bibliographic

DOI: 10.1016/j.rser.2014.07.012

Access Statistics for this article

Renewable and Sustainable Energy Reviews is currently edited by L. Kazmerski

More articles in Renewable and Sustainable Energy Reviews from Elsevier
Bibliographic data for series maintained by Catherine Liu ().

 
Page updated 2025-03-19
Handle: RePEc:eee:rensus:v:38:y:2014:i:c:p:700-705