EconPapers    
Economics at your fingertips  
 

Evaluation of labor hiring policies in construction projects performance using system dynamics

Soroush Abbaspour and Shahin Dabirian

International Journal of Productivity and Performance Management, 2019, vol. 69, issue 1, 22-43

Abstract: Purpose - The purpose of this paper is to assess different labor hiring policies for construction projects using system dynamics (SD) which have a considerable impact on project performance. Time intervals and work crew composition are two such policies. Through the implementation of a variety of policies, a managerial opportunity presents itself for the effective allocation of human resources and improvement in project performance. Design/methodology/approach - The study developed a dynamic model to assess different labor hiring policies using SD based on literature. To further distinguish between findings, the effects of the applied policies on performance were considered using earned value management. Based on a real case for validating the model, the paper discusses the potential benefits of the model, including: having a systematic and holistic view, considering dynamic the labor need and allocation, identifying alternative strategies for performance improvement and simulating the reality of the projects in a virtual model. Findings - The achieved simulation results show how different hiring policies affect project performance. This research model can aid decision makers to assess labor hiring policies in various time intervals with different compositions and assist them in selecting the best policies for effective implementation of project. Originality/value - The proposed model would be a major attempt using SD to model labor hiring policies more accurate in construction projects performance. In fact, an accurate estimate of labor needed, along with the proper planning and implementing of various labor hiring policies, presents a managerial opportunity whereby the effective allocation of workforces can be optimized leading to drastic improvement in project performance.

Keywords: Performance management; Human resource management; Construction projects; System dynamics; Earned value management; Labour hiring policies (search for similar items in EconPapers)
Date: 2019
References: Add references at CitEc
Citations: View citations in EconPapers (1)

Downloads: (external link)
https://www.emerald.com/insight/content/doi/10.110 ... d&utm_campaign=repec (text/html)
https://www.emerald.com/insight/content/doi/10.110 ... d&utm_campaign=repec (application/pdf)
Access to full text is restricted to subscribers

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eme:ijppmp:ijppm-03-2019-0134

DOI: 10.1108/IJPPM-03-2019-0134

Access Statistics for this article

International Journal of Productivity and Performance Management is currently edited by Dr Luisa Huatuco and Dr Nicky Shaw

More articles in International Journal of Productivity and Performance Management from Emerald Group Publishing Limited
Bibliographic data for series maintained by Emerald Support ().

 
Page updated 2025-03-19
Handle: RePEc:eme:ijppmp:ijppm-03-2019-0134