Adnan Enshassi, Sherif Mohamed, Peter Mayer and Karem Abed

International Journal of Productivity and Performance Management, 2007, vol. 56, issue 4, 358-368

Abstract: Purpose - Labor productivity is one of the most important factors that affect the physical progress of any construction project. In order to improve labor productivity, site production should be measured on a regular basis, and then compared to acceptable standard benchmarks. The objective of this paper is to measure masonry labor productivity in Gaza Strip, Palestine, using a consistent benchmarking approach. Design/methodology/approach - Production data were collected from nine different construction projects located in Gaza. For each project, values for baseline productivity, disruption index, performance index and project management index were calculated. Findings - Based on the nine targeted projects, the baseline productivity of masonry works in Gaza seems to range from 0.29 to 0.80 work‐hours per square meter. Calculated values were utilized to develop a correlation between two project benchmarks (i.e. disruption and project management indices). AS only four out of the targeted nine projects performed reasonably well, the paper strongly recommends developing a benchmarking standard for each local construction firm in Palestine which may lead to an improvement in the national construction productivity. Originality/value - The outcome of this research will improve the national construction productivity in Palestine and highlights the benefit of improving benchmarking standard.

Keywords: Construction industry; Labor efficiency; Labour utilization; Benchmarking; Productivity rate; Palestine (search for similar items in EconPapers)
Date: 2007
References: Add references at CitEc
Citations: View citations in EconPapers (2)

Downloads: (external link)
https://www.emerald.com/insight/content/doi/10.110 ... d&utm_campaign=repec (text/html)
https://www.emerald.com/insight/content/doi/10.110 ... d&utm_campaign=repec (application/pdf)
Access to full text is restricted to subscribers

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eme:ijppmp:v:56:y:2007:i:4:p:358-368

DOI: 10.1108/17410400710745342

Access Statistics for this article

International Journal of Productivity and Performance Management is currently edited by Dr Luisa Huatuco and Dr Nicky Shaw

More articles in International Journal of Productivity and Performance Management from Emerald Group Publishing Limited
Bibliographic data for series maintained by Emerald Support ().

 
Page updated 2025-03-19
Handle: RePEc:eme:ijppmp:v:56:y:2007:i:4:p:358-368