Structured approach to measure performance in construction research and development
Udayangani Kulatunga,
Dilanthi Amaratunga and
Richard Haigh
International Journal of Productivity and Performance Management, 2011, vol. 60, issue 3, 289-310
Abstract:
Purpose - The aim of this study is to explore performance measurement applications within construction research and development (R&D) to develop a structured approach to measure the performance of a collaborative construction R&D project during its lifecycle from initiation, conceptualisation, development, and launch stages, and during project management. Design/methodology/approach - During the exploratory phase of the study, semi‐structured interviews and a questionnaire survey were carried out to develop the performance measurement system (PMS). During the explanatory phase, the developed PMS was refined with a series of semi‐structured interviews. The data were gathered from principal investigators, researchers and industrial partners involved in collaborative construction R&D work. Findings - The main finding is the developed PMS to measure the performance of construction R&D that consists of critical success factors, performance indicators and performance measures during the lifecycle of a R&D project. Practical implications - The PMS developed through the study provides critical success factors, performance indicators and measures that need to be considered during construction R&D projects to measure the performance. Thus, through the implementation of the PMS, this study contributes to practice by assisting the performance improvement within construction R&D projects. Originality/value - The developed PMS to measure the performance of construction R&D projects will provide value for those who are engaged in R&D work (principal investigators, researchers and industrial partners) to ensure the success of their projects.
Keywords: Construction industry; Research and development; Critical success factors; Performance measures (search for similar items in EconPapers)
Date: 2011
References: Add references at CitEc
Citations: View citations in EconPapers (1)
Downloads: (external link)
https://www.emerald.com/insight/content/doi/10.110 ... d&utm_campaign=repec (text/html)
https://www.emerald.com/insight/content/doi/10.110 ... d&utm_campaign=repec (application/pdf)
Access to full text is restricted to subscribers
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eme:ijppmp:v:60:y:2011:i:3:p:289-310
DOI: 10.1108/17410401111112005
Access Statistics for this article
International Journal of Productivity and Performance Management is currently edited by Dr Luisa Huatuco and Dr Nicky Shaw
More articles in International Journal of Productivity and Performance Management from Emerald Group Publishing Limited
Bibliographic data for series maintained by Emerald Support ().