Performance analysis of new product development projects
Filippo Emanuele Ciarapica,
Maurizio Bevilacqua and
Giovanni Mazzuto
International Journal of Productivity and Performance Management, 2016, vol. 65, issue 2, 177-206
Abstract:
Purpose - – The purpose of this paper is to investigate the influence of technical and management practices of a new product development (NPD) project on the project success in terms of observed value-added time. The authors address the research questions: “How do the product innovation aspects, information process, suppliers integration and project team aspects influence the success of NPD projects in terms of observed value-added time?” Design/methodology/approach - – Specific hypotheses are posed based on literature research and semi-structured interviews with project managers used for the pilot study. In total, 40 projects carried out by multinational corporation, concerning NPD, are analysed, comparing product and project features with results obtained in terms of performance indexes usually used in “Lean Production” sector: “waste time”; and “type of wastes”. Findings - – This research highlighted that “over-processing” is the most important waste made in the projects when the product concept is Completely New. Great support has been found for the hypothesis that a clear definition of products’ concept can reduce waste time. Unexpected result has been obtained analysing “Information process aspects” category where the more frequent use of support systems (i.e. quality function deployment, computer-integrated manufacturing, computer-aided design, etc.) tended to increase waste time. Important connections have also been found between project team aspects and low waste time. Practical implications - – The identification of sources of waste can help managers to assess their current innovation practices, identify gaps between their current practice and best practice, and define action plans to close those gaps. Originality/value - – In literature, researches exploring the effects that both organizational and managerial factors have on value-added has received only scant attention. This study attempts to bridge this gap, and takes a first step to investigate the role of product innovation aspects, information process, supplier integration and project team aspects in “value-added time” in a NPD project.
Keywords: New product development; Added value; Lean production; Waste (search for similar items in EconPapers)
Date: 2016
References: Add references at CitEc
Citations:
Downloads: (external link)
https://www.emerald.com/insight/content/doi/10.110 ... d&utm_campaign=repec (text/html)
https://www.emerald.com/insight/content/doi/10.110 ... d&utm_campaign=repec (application/pdf)
Access to full text is restricted to subscribers
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eme:ijppmp:v:65:y:2016:i:2:p:177-206
DOI: 10.1108/IJPPM-06-2014-0087
Access Statistics for this article
International Journal of Productivity and Performance Management is currently edited by Dr Luisa Huatuco and Dr Nicky Shaw
More articles in International Journal of Productivity and Performance Management from Emerald Group Publishing Limited
Bibliographic data for series maintained by Emerald Support ().