EconPapers    
Economics at your fingertips  
 

Grieving the loss of a public contract: De La Rue and the Brexit passport

Anthony Flynn

Journal of Public Procurement, 2019, vol. 20, issue 1, 20-37

Abstract: Purpose - This paper aims to examine how firms react to the loss of a major government contract. Reactions to contract loss are yet to be properly studied in public procurement. Design/methodology/approach - The hypothesis is that contract loss triggers a five-stage grieving process, as predicted by the Kubler-Ross model. The hypothesis is tested using the recent UK passport contract in which the British supplier, De La Rue, lost to the Franco-Dutch supplier, Gemalto. Secondary data from corporate publications, news reporting, parliamentary debates and trade union press releases is used to compile the case. Findings - The findings show that De La Rue and its supporters passed through the five stages of grief in response to their loss. De La Rue initially exhibited denial by vowing to appeal the decision. Next came anger directed at the UK Government. An attempt to bargain was made during the standstill period. Depression set in after De La Rue admitted it would not appeal. Finally, acceptance was indicated by De La Rue pursuing new opportunities in the product authentication market. Research limitations/implications - The study is based on a single case. Further case research is warranted to test the external validity of the results. Practical implications - By debriefing unsuccessful bidders and listening to their viewpoint, public buyers can help to assuage the anger that accompanies contract loss. Social implications - Elected representatives, the media and civic society groups have vested interests in the outcome of contract competitions. Moreover, they use their agency in pursuit of their own interests, whether through political bargaining, lobbying or editorials. Originality/value - The paper demonstrates that the Kubler-Ross model of grieving has utility for understanding reactions to loss in a public procurement context.

Keywords: Contract loss; Grieving; Kubler-Ross; Brexit passport (search for similar items in EconPapers)
Date: 2019
References: Add references at CitEc
Citations:

Downloads: (external link)
https://www.emerald.com/insight/content/doi/10.110 ... d&utm_campaign=repec (text/html)
https://www.emerald.com/insight/content/doi/10.110 ... d&utm_campaign=repec (application/pdf)
Access to full text is restricted to subscribers

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eme:jopppp:jopp-06-2019-0035

DOI: 10.1108/JOPP-06-2019-0035

Access Statistics for this article

Journal of Public Procurement is currently edited by Mr David Loseby

More articles in Journal of Public Procurement from Emerald Group Publishing Limited
Bibliographic data for series maintained by Emerald Support ().

 
Page updated 2025-03-19
Handle: RePEc:eme:jopppp:jopp-06-2019-0035