Predicting engineering and schedule procurement cost growth for major dod programs
Chris J. McDaniel and
Edward D. White
Journal of Public Procurement, 2007, vol. 7, issue 3, 362-380
Abstract:
Keywords:
Date: 2007
References: Add references at CitEc
Citations:
Downloads: (external link)
https://www.emerald.com/insight/content/doi/10.110 ... d&utm_campaign=repec (text/html)
https://www.emerald.com/insight/content/doi/10.110 ... d&utm_campaign=repec (application/pdf)
Access to full text is restricted to subscribers
Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:eme:jopppp:jopp-07-03-2007-b003
DOI: 10.1108/JOPP-07-03-2007-B003
Access Statistics for this article
Journal of Public Procurement is currently edited by Mr David Loseby
More articles in Journal of Public Procurement from Emerald Group Publishing Limited
Bibliographic data for series maintained by Emerald Support ().