Measuring infrastructure investment option value

Gabriel J Power, Charli D. Tandja M., Josée Bastien and Philippe Grégoire

Journal of Risk Finance, 2015, vol. 16, issue 1, 49-72

Abstract: Purpose - – The purpose of this paper is to propose a risk-based framework to estimate the option value of infrastructure investment, accounting for the stochastic behavior of both financial and physical (engineering) variables. Design/methodology/approach - – This study uses a real-options approach and computes the optimal investment dates and option values using Least Squares Monte Carlo, both the original Longstaff – Schwartz algorithm and the constrained Least Squares approach of Le tourneau – Stentoft. Findings - – Real-option value for infrastructure investment is substantial. It is beneficial to model jointly financial and engineering risks to better understand the timing and real-option value of infrastructure investment. The analysis further shows which variables are option value drivers. Research limitations/implications - – Future work could integrate financing constraints into the model, consider path dependency in the physical state variables or integrate sovereign risk, expropriation risk, operational risk or other project risks. Practical implications - – Financial practitioners and investment managers interested in infrastructure risk finance or project finance will benefit from a novel framework to analyze infrastructure investments in which engineering and financial risks interact in a tractable way. Social implications - – Public decision-makers will benefit from a better understanding of what determines the value of infrastructure investments, how real-option value affects optimal investment timing and how both are determined by financial and engineering risks. Originality/value - – The analysis considers financial and engineering risks in a single framework to better understand option value in infrastructure investment. The framework and findings are useful both to risk finance and project finance practitioners and investors as well as engineers and public sector decision-makers.

Keywords: Project finance; Infrastructure; Monte carlo; Real options; Contingent claims analysis; Optimal timing (search for similar items in EconPapers)
Date: 2015
References: Add references at CitEc
Citations:

Downloads: (external link)
https://www.emerald.com/insight/content/doi/10.110 ... d&utm_campaign=repec (text/html)
https://www.emerald.com/insight/content/doi/10.110 ... d&utm_campaign=repec (application/pdf)
Access to full text is restricted to subscribers

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eme:jrfpps:jrf-05-2014-0072

DOI: 10.1108/JRF-05-2014-0072

Access Statistics for this article

Journal of Risk Finance is currently edited by Nawazish Mirza

More articles in Journal of Risk Finance from Emerald Group Publishing Limited
Bibliographic data for series maintained by Emerald Support ().

 
Page updated 2025-03-19
Handle: RePEc:eme:jrfpps:jrf-05-2014-0072