EconPapers    
Economics at your fingertips  
 

Perception of contractors and sub-contractors towards the factors causing delays in heating, ventilation and air conditioning (HVAC) construction projects

Aravindh Devandran, Felicita J. Davis and Michael Sammanasu Joseph

Vilakshan - XIMB Journal of Management, 2024, vol. 22, issue 1, 62-78

Abstract: Purpose - This study aims to determine and investigate the main causes of construction project delays. Construction projects are more intricate and associated with significant levels of risk owing to cost overruns. These overruns frequently lead to delays, incomplete work or other related challenges. Building delays are a prevalent problem in the building sector of developing nations. These delays prolong the duration of projects and result in increased costs and conflicts among stakeholders. A conceptual model consisting of the factors causing the delays in heating, ventilation and air conditioning (HVAC) projects was developed and tested in this study. Design/methodology/approach - A comprehensive data collection process was undertaken. A meticulously designed survey was distributed to a diverse cohort of 294 participants, including contractors and sub-contractors from Chennai, Tamil Nadu. The data was collected using stratified sampling, ensuring a representative sample. The data was then analysed using ordinary least squares multiple regression. Findings - The findings of this study have significant implications for the construction industry. They indicate that factors related to sales, clients, design, procurement, finance and labour all contribute to delays in HVAC projects. Understanding these factors can help stakeholders in the industry to better manage and mitigate project delays. Originality/value - This study is unique because it is a perceptual study of stakeholders. It provides valuable information for analysing and assessing project performance by identifying the primary causes of HVAC project delays. To the best of the authors’ knowledge, the study conducted on HVAC projects is the first of its kind and hence makes a pivotal contribution to the literature on construction projects. Additionally, the study will assist policymakers and consultants in taking necessary steps to minimize delays.

Keywords: Project management; Construction industry; Causes of delay; HVAC projects (search for similar items in EconPapers)
Date: 2024
References: Add references at CitEc
Citations:

Downloads: (external link)
https://www.emerald.com/insight/content/doi/10.110 ... d&utm_campaign=repec (text/html)
https://www.emerald.com/insight/content/doi/10.110 ... d&utm_campaign=repec (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eme:xjmpps:xjm-02-2024-0030

DOI: 10.1108/XJM-02-2024-0030

Access Statistics for this article

Vilakshan - XIMB Journal of Management is currently edited by Dr Sarat Kumar Jena

More articles in Vilakshan - XIMB Journal of Management from Emerald Group Publishing Limited
Bibliographic data for series maintained by Emerald Support ().

 
Page updated 2025-05-31
Handle: RePEc:eme:xjmpps:xjm-02-2024-0030