Comparative Study of Pipeline Deliverables using Deterministic and Stochastic Models

Ernest Oria Ihendeson, Awajiogak A Ujile and Anthony K. Leol
Additional contact information
Ernest Oria Ihendeson: Rivers State University, Port Harcourt, Nigeria
Awajiogak A Ujile: Rivers State University, Port Harcourt, Nigeria
Anthony K. Leol: Rivers State University, Port Harcourt, Nigeria

European Journal of Engineering and Technology Research, 2019, vol. 4, issue 1, 115-122

Abstract: This study aim to proffer solution to the factors causing delay is pipeline construction project deliverables, it compared deterministic model (variable with certainty) and stochastic model (variable with uncertainty), with Six (6) planned project schedules of Brownfield Energy Service Limited for pipeline construction. Time assigned to critical activities, identified from a network analysis, with the aid of the Critical Path Method, expected mean time, both deterministic and stochastic duration was calculated. Program Evaluation Review Techniques (PERT), the variance and standard deviation of the critical activities were also calculated. The probability of completion of a project within a given period was gotten with PERT. Comparing the results for deterministic duration 60 days to 79 days, which is 50% compared to 64%. It was concluded that stochastic model is preferable when scheduling and executing pipeline construction projects, because uncertainties are factored into the planning and scheduling process including delays. Delays during execution stage, occurs mainly due to community related issues, equipment failures, change in job scope and work- men antics but not limited to these. This study advocates elimination of causes of delay, especially before and during project execution phase. It also suggested that every project schedule should follow an order of precedents, prerequisite, and management involvement and cooperation at all stages of the project

Keywords: Pipeline Construction; Project Deliverable; Deterministic Models; Stochastic Models; Project Scheduling; Project Planning; Project Duration (search for similar items in EconPapers)
Date: 2019
References: Add references at CitEc
Citations:

Downloads: (external link)
https://eu-opensci.org/index.php/ejeng/article/view/61097 Abstract page (text/html)
https://eu-opensci.org/index.php/ejeng/article/download/61097/12006 Full text (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:epw:ejeng0:v:4:y:2019:i:1:id:61097

DOI: 10.24018/ejeng.2019.4.1.1097

Access Statistics for this article

More articles in European Journal of Engineering and Technology Research from European Open Science
Bibliographic data for series maintained by Support ().

 
Page updated 2026-06-22
Handle: RePEc:epw:ejeng0:v:4:y:2019:i:1:id:61097