EconPapers    
Economics at your fingertips  
 

Effects of Project Cost Overruns and Schedule Delays in Sub-Saharan Africa

Paul Terna Gbahabo and Oluseye Samuel Ajuwon

European Journal of Interdisciplinary Studies Articles, 2017, vol. 3

Abstract: This paper provides conceptual insights on the economic impact of project cost overrun and schedule delays on infrastructure procurement in developing countries with huge infrastructure deficit in Sub-Saharan Africa. Projects cost overruns and schedule delay are a major and widespread problem in infrastructure procurement the world over. It has received a lot of attention in the recent past. However, the literature reveals that extant studies on project overruns are heavily skewed towards causative factors, with little or no attention to the effects it has on the economy as a whole. The paucity of studies on the effects of project cost overrun and schedule delay will further reinforce the imperative to reacquaint policymakers and infrastructure developers, as well as project financiers with the gravity and import of the problem for infrastructural development in particular and the wider economy in general. The study undertakes an exploratory approach drawing from a wide range of secondary information and materials obtained from policy documents, study reports and peer-reviewed articles. The findings show that cost overrun and schedule delay in infrastructure procurement can have a damaging economic effect ranging from allocative inefficiency of scarce resources, further delays, contractual disputes, claims and litigation to project failure and total abandonment. The study recommends project management capacity-building for infrastructure developers, project managers as well as a number of innovative control mechanisms such as reference class forecasting, public-private partnership and computer-aided cost estimating tools including artificial neural networks, data mining, building information modelling as well as fuzzy neural inference model, genetic algorithms, and stochastic simulation to curb the menace of the problem.

Keywords: Effects; of; Project; Cost; Overruns; and; Schedule; Delays; in; Sub-Saharan; Africa (search for similar items in EconPapers)
Date: 2017
References: View complete reference list from CitEc
Citations:

Downloads: (external link)
https://brucol.be/index.php/ejis/article/view/7199 (text/html)
https://brucol.be/files/articles/ejis_v3_i2_17/Paul.pdf (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eur:ejisjr:140

DOI: 10.26417/ejis.v3i2.p46-59

Access Statistics for this article

More articles in European Journal of Interdisciplinary Studies Articles from Revistia Research and Publishing
Bibliographic data for series maintained by Revistia Research and Publishing ().

 
Page updated 2025-03-24
Handle: RePEc:eur:ejisjr:140