Investigating the Effects of Contractual Factors and Arrangements on the Optimum Level of Production in Oil and Gas Projects: Evidence from the South Pars Phases 17 & 18

Ali Emami Meibodi (), Atefeh Taklif (), Hamidreza Arbab () and Hassan Bovairi Monji ()
Additional contact information
Ali Emami Meibodi: Faculty of Economics, Allameh Tabataba’I University, Tehran, Iran.
Atefeh Taklif: Faculty of Economics, Allameh Tabataba’I University, Tehran, Iran.
Hamidreza Arbab: Faculty of Economics, Allameh Tabataba’I University, Tehran, Iran.
Hassan Bovairi Monji: Faculty of Economics, Allameh Tabataba’I University, Tehran, Iran.

Iranian Economic Review (IER), 2020, vol. 24, issue 1, 181-223

Abstract: Development of oil and gas fields is facing many risks, which are mainly due to uncertainties about the existence of commercial reserves, natural and economic environment, political conditions of host countries, legal and infrastructure issues and a market for petroleum products. In such an environment, investors are often engaged as contractors to develop and operate petroleum projects, constantly seeking to recover their capital and operating expenditures quickly, through increasing production levels. But some geological and geophysical factors, hydrocarbon structure, technological and scientific constraints, as well as some of the contractual arrangements, such as cost recovery ceiling, virtually prevent the investor from gaining access to high economic benefits and quick recovery. The purpose of this study is to investigate the effects of contractual factors and arrangements on the optimal production levels of petroleum projects. To this end, information on the South Pars phases 17 and 18 projects were collected as a case and the optimal level of rich-gas production in this project was simulated in form of a nonlinear dynamic optimization model under the Iranian Petroleum Contract and Engineering, Procurement, Construction arrangements. The production levels and scenario analysis indicated that contractual factors and arrangements could affect the optimum level of petroleum production, significantly. Given that the production paths obtained for this project are different from that drawn by the Management and Consolidated Planning department in National Iranian Oil Company, the current production profile for the Phases 17 and 18 is not optimal, in which the executive suggestions are presented. These findings would be applicable to the formulation of Master Development Plans.

Keywords: Optimal Production; Petroleum Projects; Petroleum Contracts; IPC; EPC; South Pars Gas Field. (search for similar items in EconPapers)
Date: 2020
References: Add references at CitEc
Citations: View citations in EconPapers (1)

Downloads: (external link)
ftp://80.66.179.253/eut/journl/20201-8.pdf (application/pdf)

Related works:
This item may be available elsewhere in EconPapers: Search for items with the same title.

Export reference: BibTeX RIS (EndNote, ProCite, RefMan) HTML/Text

Persistent link: https://EconPapers.repec.org/RePEc:eut:journl:v:24:y:2020:i:1:p:181

Access Statistics for this article

Iranian Economic Review (IER) is currently edited by Dr.Hossien Abbasinejad

More articles in Iranian Economic Review (IER) from Faculty of Economics,University of Tehran.Tehran,Iran Contact information at EDIRC.
Bibliographic data for series maintained by [z.rahimalipour] ().

 
Page updated 2025-03-19
Handle: RePEc:eut:journl:v:24:y:2020:i:1:p:181